A lot used by cars only is a different job from one used by delivery trucks. Tell your contractor what drives on the lot, because heavier use asks more of the base and the asphalt.
Where will the water go?
A large flat area has to shed rainwater. Standing water softens the ground and breaks down asphalt faster, so drainage should be planned before paving, not after.
What is the ground like today?
Soft spots, old failed patches and poor drainage under a lot all need attention before new asphalt goes down. Paving over a weak base only hides the problem for a while.
How should the work be scheduled?
Ask whether the job can be done in sections so part of the lot stays usable, and remember that weather can move a paving day.