Call (519) 471-3431
Paving crew compacting asphalt on a residential driveway
Services

Asphalt Driveway Paving

Illustrative image: a curved black asphalt driveway with paver edging leading to a single-storey house.
Illustrative image: a freshly paved black asphalt driveway beside a white garage door and a mulch bed.
Driveways

What does driveway paving involve?

A driveway takes daily weight and every kind of weather. A well-prepared base and properly compacted asphalt are what keep it smooth and firm for years, so most of the work on a good driveway happens before any asphalt is laid.

Jerry’s Asphalt Paving does asphalt paving for driveways. Whether you are replacing a worn driveway or putting asphalt where there is gravel or dirt today, call and describe the job and we can talk it through.

The work

What is included in the job?

Talking through your driveway and what you want done

Preparing the surface and the base underneath it

Laying hot asphalt and compacting it

A finished driveway that drains water away from the surface

Know when to act

Signs you may need paving work

  • Cracks that have spread across the surface
  • Potholes or soft spots where the surface has broken up
  • Water that stands on the driveway after rain
  • Crumbling edges where the asphalt meets the ground
  • A gravel or dirt driveway you want to replace with a paved surface

Not sure? Describe what you see when you call (519) 471‑3431 and we can talk it through.

Illustrative image: a black asphalt driveway with a paver apron curving toward a two-storey house with an attached garage.
Illustrative image: a wide black asphalt driveway beside a tall hedge in front of a house.
How a job goes

From first call to finished driveway

1

Talk it through

Call and tell us about the driveway or parking lot and what you want done.

2

Prepare the ground

The surface and the base under it are prepared so the asphalt has firm support.

3

Lay the asphalt

Hot asphalt is laid and compacted into a smooth, firm surface.

4

Ready for use

We tell you when the new pavement is ready for traffic.

Before the asphalt goes down

Good to know

The base comes first

Most of the work happens before the asphalt: the surface and the base under it are prepared so the pavement has firm support.

Water has to drain

Standing water breaks asphalt down, so how water moves across the driveway is part of the job.

Weather sets the day

Asphalt is best laid in dry conditions, so a job can move to a better day. Ask about timing when you call.

FAQ

Questions about driveway paving

Call Jerry’s Asphalt Paving at (519) 471-3431 and describe your driveway and what you want done. We can talk through the job with you.

It depends on the condition of the old surface and the base under it. A driveway with a few small cracks is a different job from one that has broken up. Call us and describe what you see.

Fresh asphalt needs time to cool and firm up, and heavier vehicles need longer than cars. We will tell you when your driveway is ready for traffic once the job is done.

Yes. Asphalt is best laid in dry conditions and is hard to work well in cold or wet weather, so a job may be moved to a better day. Ask us about timing when you call.

Long new residential asphalt driveway paved by Jerry's

Ready to talk about your paving job?

Call (519) 471‑3431 or send a request and tell us about your driveway or parking lot.

Call nowRequest a quote