Asphalt Parking Lot Paving
What does parking lot paving involve?
A parking lot carries far more traffic than a driveway, and it has to move rainwater off a large flat area. That makes preparation and drainage the heart of a parking lot job.
Jerry’s Asphalt Paving does asphalt paving for parking lots. Call and tell us about the lot, how it is used and what condition it is in today, and we can talk through the work.
LotsBusinesses and industrial sites
What a parking lot job depends on
Most of the work happens before the asphalt: the surface and the base under it are prepared so the pavement has firm support.
Standing water breaks asphalt down, so how water moves across the lot is part of the job.
Asphalt is best laid in dry conditions, so a job can move to a better day. Ask about timing when you call.
Markings, drainage and traffic
What is included in the job?
- Talking through your lot, how it is used and what you want done
- Preparing the surface and the base underneath it
- Laying hot asphalt and compacting it
- Attention to how water drains across the lot
Signs you may need paving work
- Cracking that has spread across large parts of the lot
- Potholes or sunken areas that collect water
- Surface that is breaking up or crumbling at the edges
- An unpaved lot that you want to turn into a paved one
- Damage that is getting worse each season
From first call to finished lot
1
Call and tell us about the driveway or parking lot and what you want done.
2
The surface and the base under it are prepared so the asphalt has firm support.
3
Hot asphalt is laid and compacted into a smooth, firm surface.
4
We tell you when the new pavement is ready for traffic.
Questions about parking lot paving
Call Jerry’s Asphalt Paving at (519) 471-3431 and tell us about the lot, its size and condition, and what you want done.
Often the work can be planned so part of a lot stays usable, but it depends on the lot and the job. Ask us about scheduling when you call.
Traffic, drainage and the condition of the ground under the lot. Heavier use and poorer drainage mean more attention to the base before the asphalt goes down.
Yes. Asphalt is best laid in dry conditions, so jobs can move for weather. We will talk through timing with you.
Ready to talk about your paving job?
Call (519) 471‑3431 or send a request and tell us about your driveway or parking lot.
