Call (519) 471-3431
Illustrative image: a wide new asphalt parking lot with white lines beside a multi-storey building.
Services

Asphalt Parking Lot Paving

Parking lots

What does parking lot paving involve?

A parking lot carries far more traffic than a driveway, and it has to move rainwater off a large flat area. That makes preparation and drainage the heart of a parking lot job.

Jerry’s Asphalt Paving does asphalt paving for parking lots. Call and tell us about the lot, how it is used and what condition it is in today, and we can talk through the work.

Commercial asphalt parking lot with yellow stall lines
Illustrative image: an asphalt parking lot with white and yellow lines and a curb in front of a shopping building.

LotsBusinesses and industrial sites

Planning

What a parking lot job depends on

The base comes first

Most of the work happens before the asphalt: the surface and the base under it are prepared so the pavement has firm support.

Water has to drain

Standing water breaks asphalt down, so how water moves across the lot is part of the job.

Weather sets the day

Asphalt is best laid in dry conditions, so a job can move to a better day. Ask about timing when you call.

Markings, drainage and traffic

Illustrative image: fresh black asphalt with yellow line markings in a large parking lot.
Paved parking lot with yellow lines and an accessible parking space
Illustrative image: a large asphalt parking lot with white stall markings and trees in the background.
The work

What is included in the job?

  • Talking through your lot, how it is used and what you want done
  • Preparing the surface and the base underneath it
  • Laying hot asphalt and compacting it
  • Attention to how water drains across the lot
Know when to act

Signs you may need paving work

  • Cracking that has spread across large parts of the lot
  • Potholes or sunken areas that collect water
  • Surface that is breaking up or crumbling at the edges
  • An unpaved lot that you want to turn into a paved one
  • Damage that is getting worse each season
Illustrative image: a parking lot with white lines curving around a grass island and trees.
How a job goes

From first call to finished lot

1

Talk it through

Call and tell us about the driveway or parking lot and what you want done.

2

Prepare the ground

The surface and the base under it are prepared so the asphalt has firm support.

3

Lay the asphalt

Hot asphalt is laid and compacted into a smooth, firm surface.

4

Ready for use

We tell you when the new pavement is ready for traffic.

FAQ

Questions about parking lot paving

Call Jerry’s Asphalt Paving at (519) 471-3431 and tell us about the lot, its size and condition, and what you want done.

Often the work can be planned so part of a lot stays usable, but it depends on the lot and the job. Ask us about scheduling when you call.

Traffic, drainage and the condition of the ground under the lot. Heavier use and poorer drainage mean more attention to the base before the asphalt goes down.

Yes. Asphalt is best laid in dry conditions, so jobs can move for weather. We will talk through timing with you.

Ready to talk about your paving job?

Call (519) 471‑3431 or send a request and tell us about your driveway or parking lot.

Call nowRequest a quote